News The Tunnel Is Dead—Long Live the Tunnel
posted by on January 18 at 10:13 AM
To keep the viaduct discussion in one place: Here are links to all of yesterday’s tunnel coverage on Slog.
The mayor plans a surge.
I have a theory.
Erica weighs in.
Slog breaks the news.
Hovering outside Gregoire’s office.
and here’s
and the

Thanks, Josh. So, if it's not dead, is it undead? Seems to me the gov was pretty darned clear and if there's no cash for the lower capacity baby tunnel, ain't gonna be no tunnel, right?
Still wish we had a vote on Elevated Viaduct versus Surface Plus Transit options, though.
I hate this project.
Which project?
They should site capacity the same way they project inflation, i.e. This project is going to cost [XX] amount in 2012 dollars, which in 2012 (again, a hypothetical time frame) will accommodate a potential [X]% of trips. They might find that no matter how they crunch the numbers, in the long term, they may be spending billions and on an actually reduced capacity highway.
Comments Closed
In order to combat spam, we are no longer accepting comments on this post (or any post more than 14 days old).